Bertin Ergonomie has a long history with the Flamanville EPR. Back in 2006, Bertin Ergonomie was entrusted with the ergonomics of the control room fittings for this first fully automated power plant in the world. Bertin Ergonomie has once again been asked to help EDF carry out the 4th test campaign for the EPR control system. The aim is to evaluate the plant's control activity in simulation and to test scenarios in normal, incidental and accidental situations.
