As part of the project to introduce automated shuttles on Line 13, work has begun on upgrading the existing Central Control Centre (CCC). The RATP sought the expertise of Human Design Group: the main challenge was to design the layout of the temporary Centralised Control Centre (PCC), a transitional yet critical piece of infrastructure to be used whilst work is carried out on the main PCC.
How can we align the various stakeholders (construction, operator, IT, project) and incorporate strict standardised ergonomic requirements into a confined space measuring just 100 m² ? To address this complex issue, Human Design Group has rolled out its Three Diamonds model, ensuring a solution that is both desirable for operators and technically viable.
This collaboration has resulted in the delivery of a comprehensive fit-out solution that meets the rail industry’s most stringent requirements.